Last updated 2026-08-19

TL;DR
Georgia does not issue one statewide dry stack marina license. You form a business with the Secretary of State, get a local occupational tax certificate plus zoning and building permits, then add water permits if you touch marsh or navigable water. Coastal work often needs a CMPA permit. Confirm every fee and clock with the issuing board.
Do you need a license for a dry stack marina in Georgia?
You do not get one statewide dry stack marina license in Georgia. What you get is a pile of ordinary business filings plus site, building, and water permits that change with the shoreline you touch.
People call the county and ask for a marina license. Staff often point them at an occupational tax certificate. That certificate lets you collect money in that city or county. It does not authorize racks in a floodplain, a launch that crosses marsh, or a commercial operation on a USACE lake.
If your racks sit on upland, you still need zoning that allows the use, a building permit for the structure, and stormwater coverage once you disturb enough land. If any part of the work is in marsh or navigable water, state and federal water permits kick in. Coastal dry stack marina Georgia projects often go through the Coastal Marshlands Protection Committee.[1][2]
I would not hire anyone who talks about pulling your Georgia marina license as if it were a bar card. That pitch wastes months.
Georgia law is blunt on marsh. O.C.G.A. § 12-5-286 says, "No person shall remove, fill, dredge, drain, or otherwise alter any marshlands or construct or locate any structure on or over marshlands in this state within the estuarine area thereof without first obtaining a permit from the committee."[1]
That is a permit, not a trade license. Read it that way. Inland operators make the same mistake in reverse when they assume DNR issues a stack license because boats are involved. DNR boat paperwork is about vessels, not about your building.
What filing fees can you actually look up before you buy land?
Desk fees you can confirm in writing are small. Georgia Secretary of State charges $100 to file Articles of Organization for an LLC.[6] Annual registration is $50 for that LLC once you are on the books.[7]
A USACE individual permit application fee is $100 when the project is commercial, and $10 when it is private and noncommercial.[5] Those numbers live in 33 CFR 325.1. They have not kept up with real project cost. Do not treat them as your budget.
Local occupational tax is a different animal. O.C.G.A. § 48-13-6 lets cities and counties levy an occupation tax.[12] The dollar amount is local. Confirm it with the clerk where the racks will sit. I have watched people budget a state marina fee that does not exist, then get surprised by a city tax plus a building permit calculated on construction value.
Skip anyone selling you a package Georgia dry stack license for thousands of dollars. Pay the SOS. Pay the city. Save the real money for a current survey and for counsel who has filed CMPA or USACE paper before.
The chart below is only the look-up desk fees. Land and steel live in another universe.
Coastal marsh or inland lake, which paper path are you on?
Your first split is geography. Coastal estuarine marsh is a Coastal Marshlands Protection Act problem. Inland, you may be on a USACE lake, a utility lake, a Corps tailwater, or a private pond with a stream nexus.
On USACE project land and water, you do not freelance a business. 36 CFR 327.19 states, "The engaging in or solicitation of business on project land or waters without the express written permission of the District Commander is prohibited."[13] Lake Lanier, Allatoona, Hartwell, West Point, and several other Georgia lakes sit in that world. A dry stack on those shores is a concession or shoreline issue, not a city sticker.
Private land on a tidal creek is the CMPA path, plus often USACE Section 10 and Section 404.[1][3][4] Private land on a non-tidal lake still needs local zoning. If you add a launch or you dredge a connection to waters of the United States, federal review shows up.
I would walk the parcel with a surveyor and a wetlands scientist before I priced racks. People skip that and buy a waterfront tract that is mostly jurisdictional wetland.
| Situation | Typical lead office | What you are asking for |
|---|---|---|
| Coastal marsh, dock or structure over marsh | Coastal Marshlands Protection Committee and CRD | CMPA permit [1][2] |
| Navigable water or waters of the U.S. | USACE Savannah District, or Mobile on some lakes | Section 10 or 404 [3][4] |
| USACE lake commercial use | USACE District Commander | Written commercial permission or lease [13] |
| Upland racks only, no water work | City or county | Zoning, building, occupational tax [12][14] |
| Land disturbance around 1 acre or more | Local issuing authority and Georgia EPD | Erosion permit and NPDES construction coverage [9] |
How much does a dry stack marina cost in Georgia?
Nobody publishes an honest statewide price tag for standing up a dry stack marina in Georgia. The look-up fees above are hundreds of dollars. The project is land, steel, pavement, drainage, a launch or well, a forklift or travel lift, power, and working capital.
I will not invent a per-rack construction number. Bids move with steel, soil, flood design, and whether you need a bulkhead. Ask marine contractors for a schematic bid after you have a survey. That is the only number I would take to a bank.
Soft costs that are real include an ALTA survey, a wetland delineation, geotechnical borings, civil plans, and building permit fees set as a local percentage of value. A CMPA or USACE consultant is real if you are in their jurisdiction. Put those line items in your pro forma as ranges you update after quotes, not as folklore from a Facebook group.
Insurance will dwarf your SOS filing. Forklift and rack liability is its own conversation. If you want a worksheet for forklift, insurance, and slip math, DryStackPath sells a $199 one-time Forklift + Insurance + Slip-Math Kit at /start. It is a planning kit, not a permit, and it does not speak for any Georgia board.
Custom brand work before rezoning is a waste of money. Buying boats to fill empty racks so the place looks busy for a lender tour is a waste of money. Get the use approved first.
If you want a side-by-side of another state's desk fees, dry stack marina cost in Alabama is a clean comparison.
How long does a dry stack marina take in Georgia?
I will not give you an approval date. Anyone who does is guessing or selling.
The slow pieces I see start with site control. Rezoning or a special use permit can consume a season of hearings. Federal water permits, when they apply, add a public notice period you do not control.
A clean upland site in a zoning district that already allows boat storage can move at the speed of site plan and building permit. A marsh-front site with a new commercial dock is a different year of your life.
USACE standard permits and CMPA applications go through public notice. Nationwide or general permits, when they fit, are usually shorter than a full individual permit. Confirm the current review path with Savannah District or the district that owns your lake.[5][2]
Building the racks, once permitted, is a construction schedule. Steel lead times vary. I would not promise a first year opening unless zoning is already done and the water work is either unnecessary or already authorized.
Local hearings slip. Applicants miss completeness comments. Budget contingency in months, then confirm the present queue with the planner and the project manager at the Corps or CRD. No article can hold those queues still.
People who want a longer inland start narrative can skim how to start a dry stack marina in Arkansas for a different pattern. Do not copy the timeline. Copy the habit of listing each board.
What does the Coastal Marshlands Protection Act actually cover?
CMPA is about marshlands in the estuarine area, not about your LLC. Coastal Resources Division staffs the Coastal Marshlands Protection Committee. You apply when you will alter marsh or put a structure on or over it.[1][2]
Upland dry stack racks set back from marsh, with no new dock, sometimes stay out of CMPA. The launch, a walkway, riprap, or a pile-supported pier usually does not. Do not let a real estate listing decide jurisdiction. A delineation and a pre-application talk with CRD decide it.
Federal consistency under the Coastal Zone Management Act can attach when a federal permit is in play on the Georgia coast. NOAA explains the consistency process, and CRD runs Georgia's piece.[15] That is another completeness item, not a separate marina license.
I would request a pre-application meeting. Bring a survey with the marsh and upland line. Bring a simple site plan. Leave the glossy packet at home.
Fees and hearing dates change. Confirm both on the current CRD marsh permit materials before you write a check.[2]
When do you need a USACE Section 10 or 404 permit?
Section 10 of the Rivers and Harbors Act of 1899 regulates structures and work in navigable waters of the United States. 33 U.S.C. § 403 prohibits unauthorized obstructions to that navigable capacity.[3] Section 404 of the Clean Water Act regulates discharges of dredged or fill material into waters of the United States, including many wetlands.[4]
A new launch ramp, dredging a basin, fill in wetlands, or a pier in navigable water is classic Corps territory. Dry racks sitting on previously filled upland, with no discharge and no work waterward of the ordinary high water mark, may avoid a new 404 or Section 10 permit. May is doing a lot of work. Have a consultant or the project manager tell you in writing.
Savannah District handles much of coastal and eastern Georgia. Some reservoirs sit with Mobile District. File in the district that has the water.
If the Corps permit is required, Georgia EPD may need to issue a Clean Water Act Section 401 water quality certification.[8] That is a state water quality decision tied to the federal permit. Again, not a marina license.
I treat a no permit required opinion that is only verbal as worthless. Get the email.
What local zoning and building permits actually stop projects?
Most dry stack ideas die in zoning, not at DNR. Boat storage, outdoor racks, forklift backup alarms at dawn, and trailer traffic are land use fights. If the parcel is residential or a fussy mixed district, you are looking at a special use permit or a rezoning. That means public hearings and neighbors.
Once the use is allowed, Georgia's statewide minimum construction codes apply through the local building department. The Department of Community Affairs publishes the codes Georgia adopts.[14] Your racks, office, and any shop are building code and fire code problems. They are also a floodplain development permit problem if you are in a mapped special flood hazard area.
I would pull the zoning letter and the flood map before I order steel. A floodplain elevation requirement can change pile length and cost more than your first year of occupancy tax.
Occupational tax is the local business license people mean. It comes from the city or county under Title 48.[12] Get it when you are ready to transact. It is not a substitute for a building permit.
If a planner says just get your marina license from the state, ask them to name the statute.
Do forklift, fuel, and stormwater rules count as licenses?
They are not a marina license. They still shut you down if you ignore them.
Powered industrial trucks fall under OSHA 29 CFR 1910.178. The employer has to show each operator is competent through the training and evaluation in paragraph (l) of that standard. It applies in Georgia workplaces.[10]
If you disturb about one acre or more, Georgia NPDES construction stormwater coverage and local erosion permits apply. EPD runs the construction stormwater general permits.[9] Under an acre you may still need a local land disturbance permit. Confirm the acreage trigger and the current permit name with EPD and the county.
Fuel changes everything. SPCC rules apply when aggregate aboveground oil storage capacity is greater than 1,320 gallons.[11] Underground tanks pull you into Georgia EPD's UST program. If you have no fuel, do not draw a fuel island for later on the first site plan. You inherit a pile of paper.
A small shop tank for the forklift can still matter once you add drums. Count gallons before you assume you are under the line.
What business filings come first in Georgia?
Form the entity before you sign a land contract in your personal name if you can help it. Most people use a Georgia LLC. File Articles of Organization with the Secretary of State. The filing fee listed on the SOS how-to guide is $100.[6] Get an EIN from IRS. Register for whatever state tax accounts DOR says you need once you know how you will charge customers. Confirm those tax types with DOR. I will not guess your mix of storage, labor, and parts.
File the annual registration. The SOS lists a $50 annual registration for the LLC.[7] Miss it and you scramble later when a bank or a landlord asks for a certificate of existence.
If you are a foreign LLC, you need a certificate of authority. Confirm that fee on the SOS site. Do not assume it matches the domestic $100 figure.
This is the boring path. It is also the path that lets you open a bank account. For a neighboring state's version of the same first filings, see dry stack marina license in Alabama and the longer how to start a dry stack marina in Alabama walkthrough.
What is a waste of money in year one?
A full custom brand system before the special use vote is a waste. A second travel lift when one forklift would launch the boats you can actually sell is a waste. Paying a general business license expediter who has never sat in a CMPA hearing is a waste.
I would spend on a survey, a wetland delineation, and a civil engineer who has permitted a boat facility in that county. Add a local land use lawyer if the zoning is dirty. I would not spend on a national consultant who does not know Chatham County from Cherokee County.
Do not buy the parcel subject to permits with a 30 day diligence window. Water permits do not live on that clock.
The agencies change when you leave the state. The habit of listing every permit does not. Dry stack marina license in Colorado is a reservoir contrast if you want one.
How do you confirm fees and timelines with the right board?
Call the issuing office and ask for the current fee schedule and completeness checklist. Then get it in writing. Web pages lag. Receptionists remember last year's form.
Use this map. Secretary of State Corporations Division for the LLC and annual registration.[6][7] City or county clerk for occupational tax.[12] Local community development for zoning and building.[14] Coastal Resources Division for CMPA.[2] USACE regulatory project manager for Section 10 and 404.[3][4][5] EPD for 401 and construction stormwater.[8][9] The District Commander or lake manager for commercial use on a Corps lake.[13]
I keep a one page permit matrix with agency, application name, fee as confirmed that month, and the name of the human who confirmed it. When two agencies disagree about jurisdiction, I ask both to put the disagreement in email. That email is more useful than a brochure.
No approval or timing guarantees live in this article. Queues move.
If you are collecting state guides, dry stack marina license in California and dry stack marina license in Arkansas show how far the paper drifts once you leave Georgia.
What should you do in the first 90 days?
Prove the use is legal on that parcel. Get a zoning verification letter. Order a boundary and topographic survey. If there is any hint of marsh, stream, or wetland, hire a delineation. Walk the site with the county planner.
Form the LLC and open the bank account.[6] Do not spend brand money yet.
If the water is a Corps lake, call the lake office before you call an architect. Written commercial permission is the whole game there.[13]
If it is coastal private land, request a CRD pre-application conversation and ask Savannah District whether they want a pre-app too.[2]
Sketch a rack count that fits turning radii for the forklift you can staff and insure. That math belongs on a napkin before it belongs in a rendering.
DryStackPath is an independent publisher, not a law firm and not a permitting shop. Use /start only if you want the planning kit. For legal calls, hire Georgia counsel.
Frequently asked questions
Do you need a license for dry stack marina in Georgia?
No single statewide dry stack marina license exists. You need a Georgia business entity, a local occupational tax certificate, zoning and building permits, and then water permits if you touch marsh, wetlands, or navigable water. Coastal work often needs a CMPA permit. Corps lakes need written commercial permission. Confirm each item with the issuing board.
How much does dry stack marina cost in Georgia?
Look-up desk fees are small. Georgia LLC articles are $100 and annual registration is $50 on the SOS guides. A commercial USACE individual permit application fee is $100 in 33 CFR 325.1. Local occupational tax and building permit fees vary by city. Rack, land, and insurance costs need contractor and broker quotes. Nobody has a clean statewide build price.
How long does dry stack marina take in Georgia?
There is no honest statewide clock and no approval promise. An already zoned upland site can move with site plan and building permit speed. Rezoning, CMPA public notice, and a USACE individual permit can push the paper into many months. Confirm the present queue with the planner, CRD, and the Corps project manager.
Does an upland-only rack building need a CMPA permit?
Not always. CMPA applies when you alter marshlands or put a structure on or over marsh in the estuarine area. Racks set entirely on upland with no new dock, walkway, or fill in marsh sometimes stay out. A launch or pier usually does not. Get a delineation and ask Coastal Resources Division before you assume you are clear.
Can you open a dry stack on Lake Lanier without USACE permission?
Not as a business on project land or water. 36 CFR 327.19 bars engaging in or soliciting business on USACE project land or waters without written permission from the District Commander. Lake Lanier and several other Georgia lakes sit in that system. Call the lake office before you hire an architect.
Is the city occupational tax the same as a marina license?
No. Occupational tax under O.C.G.A. § 48-13-6 is the local tax many clerks call a business license. It lets the city or county tax the occupation. It does not authorize construction, marsh work, or a Corps-lake concession. You still need zoning, building, and any water permits that fit the site.
Do dry stack forklift operators need OSHA training in Georgia?
Yes if they operate powered industrial trucks at work. OSHA 29 CFR 1910.178 requires the employer to make sure each operator is competent through training and evaluation. Georgia does not replace that federal rule with a special marina forklift card. Keep the evaluations on file before the first busy Saturday.
When does Georgia stormwater permitting kick in?
Plan on NPDES construction stormwater coverage and local erosion permits once land disturbance is about one acre or more. EPD runs the construction general permits. Smaller sites can still need a local land disturbance permit. Confirm the current permit name and acreage trigger with EPD and the county issuing authority.
Do you need SPCC if you only store a little oil for the forklift?
Maybe. EPA SPCC generally applies when aggregate aboveground oil storage capacity is greater than 1,320 gallons. A single small tank can sit under that line. Drums plus a shop tank plus a day tank add up fast. Count every container of 55 gallons or more and confirm with the current 40 CFR 112 text or an SPCC consultant.
What if you lease the land instead of buying it?
The permits still follow the work and the use, not your deed. You still need the landlord's written right to build and operate. On a USACE lake the commercial permission or lease is its own path. On private land, zoning and building permits stay with the site. Do not sign a short diligence lease and assume water permits will land inside it.
Do you need a Georgia contractor license to own the marina?
Owning the business is not the same as acting as the general contractor. If you contract the building work yourself, the person who holds that contract generally needs the right Georgia contractor license. Confirm the class with the State Licensing Board for Residential and General Contractors. Hiring a licensed GC is the cleaner first year move.
How do you confirm the current CMPA fee?
Ask Coastal Resources Division for the current marsh permit fee schedule and application checklist, then get that answer in writing. Do not trust a blog, including this one, for a dollar figure that the committee can change. Pre-application meetings are worth more than guessing the form version off a cached PDF.
Is boat storage taxable in Georgia?
Do not guess from a forum thread. How you invoice storage, launch labor, parts, and memberships can land in different DOR buckets. Confirm the current sales and use tax treatment with the Georgia Department of Revenue for your actual charge mix before you print a rate sheet.
What happens if you skip the annual LLC registration?
Georgia expects an annual registration. The SOS how-to materials list a $50 fee for the LLC. Miss it and you can lose good standing, which shows up when a bank, landlord, or title company asks for a certificate of existence. File it on the SOS calendar. It is cheaper than curing an administratively dissolved entity mid-loan.
Sources
- O.C.G.A. § 12-5-286 (Justia Georgia Code): Georgia requires a Coastal Marshlands Protection Committee permit before altering marshlands or locating a structure on or over marshlands in the estuarine area.
- 33 U.S.C. § 403, Rivers and Harbors Act Section 10 (Cornell LII): Federal law prohibits unauthorized obstructions to the navigable capacity of waters of the United States.
- 33 U.S.C. § 1344, Clean Water Act Section 404 (Cornell LII): Section 404 regulates discharges of dredged or fill material into waters of the United States.
- 33 CFR 325.1, USACE permit applications and fees (eCFR): USACE individual permit application fees are $100 for commercial or industrial projects and $10 for private noncommercial projects.
- Georgia Secretary of State, How to Form a Limited Liability Company (LLC): Georgia Secretary of State lists a $100 fee to file Articles of Organization for an LLC.
- Georgia Secretary of State, How to File an Annual Registration: Georgia Secretary of State lists a $50 annual registration fee for an LLC.
- Georgia EPD, Storm Water (NPDES construction): Georgia EPD administers NPDES construction stormwater permits that typically apply once land disturbance reaches about one acre.
- OSHA 29 CFR 1910.178, Powered industrial trucks: Employers must ensure each powered industrial truck operator is competent through training and evaluation.
- O.C.G.A. § 48-13-6 (Justia Georgia Code): Georgia cities and counties may levy a local occupation tax on businesses.
- 36 CFR 327.19, Commercial activities on USACE projects (eCFR): Commercial activity on USACE project land or waters requires express written permission of the District Commander.
- NOAA Office for Coastal Management, Federal Consistency: Federal consistency review under the Coastal Zone Management Act can apply when a federal permit is proposed in a state's coastal zone.