Dry stack marina board in Georgia and the paper you file

No single dry stack marina board exists in Georgia. Plan on CMPA or Corps paper, EPD, and a local occupational tax. Confirm every fee. Read the path.

DryStackPath Editorial Team
23 min read
In This Article

Last updated 2026-08-21

Steel dry stack racks beside a Georgia tidal creek at dusk
Steel dry stack racks beside a Georgia tidal creek at dusk

TL;DR

Georgia has no statewide dry stack marina license and no single marina board. Coastal work in marshlands goes to the Coastal Marshlands Protection Committee. Navigable waters and wetlands also need a U.S. Army Corps permit and usually a Georgia EPD 401 review. Inland Corps lakes need a shoreline lease. Cities still issue zoning, building permits, and an occupational tax certificate. Confirm every fee.

What is the dry stack marina board in Georgia?

Georgia does not run a single dry stack marina board. People hunt for one office because that is how other trades work. A dry stack is not a barber shop. You file with several bodies, and only one of them looks like a board.

On the coast, the named voting body for work in marshlands is the Coastal Marshlands Protection Committee. It sits with the Georgia Department of Natural Resources Coastal Resources Division. If your racks, bulkhead, or travel path sit on or over marsh, that committee is the board that actually votes. [1] [2]

Inland, the name disappears. A dry stack marina Georgia site on Lake Lanier, Allatoona, Hartwell, or another federal lake lives on a U.S. Army Corps of Engineers shoreline lease plus a Department of the Army permit. On a Georgia Power lake you start with Georgia Power shoreline rules, then still face Corps and local paper if you touch water or wetlands.

Cities and counties control zoning, building permits, fire review, and the occupational tax certificate most people call a business license. The Secretary of State only files your company. None of those desks is a marina board.

If a broker tells you to grab "the state marina license" first, they are repeating a national myth. I'd walk into the county planning counter and the Corps pre-application meeting before I paid anyone for a license package.

Do you need a license for a dry stack marina in Georgia?

You do not need a statewide dry stack marina license in Georgia, because the state does not issue one. You do need a stack of other paper: an entity filing, a local occupational tax certificate, building permits, and, if you touch marsh, wetlands, or navigable water, CMPA and Corps permits. Confirm the local certificate with the city or county that has the site.

Georgia lets cities and counties levy an occupation tax on trades. That certificate is the closest everyday "license" you will hang on the office wall. The statute that lets local governments do this is O.C.G.A. § 48-13-6. [14] Fees, classes, and renewals are local. Savannah is not Brunswick. A county island is not a city lot. Confirm the current form and dollar amount with that clerk. Do not copy a fee you saw in another county.

The Coastal Marshlands Protection Act is a permit, not a professional license. O.C.G.A. § 12-5-286 says, "No person shall remove, fill, dredge, drain, or otherwise alter any marshlands or construct or locate any structure on or over marshlands in this state within the estuarine area thereof without first obtaining a permit from the committee." [1] That sentence is the whole coastal trigger. Racks over marsh need the committee. Racks on dry upland, well back from jurisdictional marsh, may not. A surveyor and CRD staff, not a blog, draw that line.

Federal permits are also not occupational licenses. They are project authorizations. You can be a perfectly legal LLC and still be illegal in the water if you skip them.

I'd form the LLC, book the planner, and book the Corps or CRD pre-application meeting in the same week. Paying a national vendor for a "marina operator license" is a waste of money here.

Which agencies actually sign off on a Georgia dry stack?

A dry stack marina Georgia file is a pile, not a single stamp. The mix depends on whether you are in marsh, on a federal lake, or on private upland next to a creek.

The Coastal Marshlands Protection Committee and DNR Coastal Resources Division review structures and alterations in estuarine marshlands. That is the state coastal board path. [2]

The U.S. Army Corps of Engineers Savannah District or Mobile District (the lake dictates the district) reviews work in navigable waters and discharges of dredged or fill material into waters of the United States. Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act are the two federal hooks. [3] [5] [7]

Georgia Environmental Protection Division handles 401 water quality certification that often rides with the federal permit, plus construction and industrial stormwater coverage. [8] [9]

The city or county handles zoning, land disturbance, building, floodplain, and the occupational tax certificate. The State Fire Marshal's office and the local fire official handle the rack building, spray booth if you add service, and fuel if you add fuel. [13]

The Secretary of State files the company. The Georgia Department of Revenue issues the sales and use tax account if you sell storage, parts, or labor the way DOR treats those receipts. [11] [12]

OfficeWhat they actually stampWhere it shows up
Coastal Marshlands Protection CommitteePermit to build or alter in marshlandsCoast, estuarine area
USACE Savannah or Mobile DistrictSection 10 / Section 404 authorizationNavigable water or wetlands
Georgia EPD401 certification, stormwater NOIStatewide when triggered
City or countyZoning, building, occupational taxEvery site
Secretary of StateLLC or corporate filingEvery for-profit operator

That table is the real org chart. Keep it in the bid book. If a consultant cannot point to a row, they are selling air.

Official filing fees on a Georgia dry stack paper path Agency filing fees only. Construction, land, and local occupational tax are separate and local. $100 USACE commercial DA appli… $100 Georgia LLC articles of o… $50 Georgia LLC annual regist… Source: 33 CFR Part 325; Georgia Secretary of State, 2026

How does the Coastal Marshlands Protection Committee work?

The committee is a real voting body, not a slogan. Staff at Coastal Resources Division take the application, check completeness, and run the public process. The committee then grants, denies, or conditions the permit. Confirm the current application form, fee, and meeting calendar with CRD. Those items move. I will not invent a current fee or a guaranteed hearing month. [2]

The legal on-switch is still O.C.G.A. § 12-5-286. If you construct or locate a structure on or over marshlands in the estuarine area, you need the committee first. [1] A dry stack that cantilevers over cordgrass is not a loophole. A launch well cut into marsh is not a loophole.

Upland racks behind a clean jurisdictional line are a different story. You may still need local building and stormwater paper. You may still need Corps review if you fill wetlands or put a structure in navigable water. You may not need CMPA. That is a site call.

Public notice is not optional theater. Neighbors, boat clubs, and environmental groups read these files. Incomplete drawings are how you lose a cycle. I'd spend money on a tight survey, a marsh delineation, and a structure plan that matches what you will actually weld, not on renderings for Instagram.

Shore Protection Act review is a separate coastal statute if you sit on sand-sharing beaches and dunes, not typical creek marsh. Most dry stack marina Georgia sites I would scout sit on tidal creeks and industrial waterfront, so CMPA shows up more than Shore Protection. Confirm the program with CRD if you are oceanfront.

What federal paper does a Georgia dry stack need?

If the project creates an obstruction in navigable waters of the United States, Section 10 applies. 33 U.S.C. § 403 states, "The creation of any obstruction not affirmatively authorized by Congress, to the navigable capacity of any of the waters of the United States is prohibited." [5] A pile-supported launch well, a pier, or racks over a navigable creek is the kind of structure 33 CFR Part 322 was written to review. [7]

If you discharge dredged or fill material into waters of the United States, including wetlands, Section 404 applies. EPA describes it in plain language: "Section 404 of the Clean Water Act (CWA) establishes a program to regulate the discharge of dredged or fill material into waters of the United States, including wetlands." [3] Upland pavement that stays out of wetlands is not a 404 event. A fill pad in a wetland is.

USACE decides if you fit a nationwide or regional general permit or if you need an individual permit. Individual permits carry public notice and a public interest review. Processing rules live in 33 CFR Part 325. A commercial Department of the Army permit application carries a $100 fee under that part. A noncommercial application is $10. Confirm the district still collects it the same way when you file. [4] [6]

Georgia EPD's 401 water quality certification usually travels with the federal permit when waters of the state are in play. [8] Coastal Zone Management federal consistency can also attach on the coast. Ask CRD if your federal permit needs a consistency concurrence. Do not guess.

A pre-application meeting with Savannah District or Mobile District is the cheapest hour you will spend. Bring a survey, not a vibe.

How much does a dry stack marina cost in Georgia?

The only statewide numbers you can treat as official are small filing fees, including $100 to file Articles of Organization with the Georgia Secretary of State. [11] The marina itself costs whatever land, steel, pavement, stormwater work, and a forklift cost on that parcel. Nobody publishes a clean Georgia-only dry stack turnkey series. Confirm current agency fees with each board.

The Georgia Secretary of State charges $100 to file Articles of Organization for an LLC. [11] Annual registration is $50. [12] A commercial Department of the Army permit application carries a $100 fee under 33 CFR Part 325. [6] Local occupational tax, building permits, land-disturbance fees, and impact fees are set by the city or county. I will not invent those. Call the clerk.

Construction is the real money. Rack steel, foundations, asphalt, drainage, a mast-height forklift or travelift, fire protection, and power dwarf every state filing. Those bids move with steel and labor. Anyone quoting a single national per-slip number without walking your soils and wind load is selling a brochure.

Waste of money: buying the forklift before the Corps or CMPA pre-application meeting. Waste of money: a national "license kit" that does not name O.C.G.A. § 12-5-286. Useful spend: a wetland delineation, a civil set that already meets the county stormwater manual, and a lawyer who has filed CMPA or SAS paper before.

If you want slip math and a forklift plus insurance checklist in one binder, DryStackPath sells a $199 one-time Forklift + Insurance + Slip-Math Kit at /start. Use it or ignore it. The agency path above does not depend on it.

Sales tax accounts from the Department of Revenue do not carry a glamorous fee story. Register if you will make taxable sales. Confirm nexus and what DOR treats as taxable storage or service on the current sales and use tax pages. [13]

How long does a dry stack marina take in Georgia?

There is no published statewide clock for standing up a dry stack marina in Georgia. An upland-only building permit follows the county building department. A CMPA decision follows completeness review and the committee calendar. A Corps individual permit follows public notice and review. Confirm current queues with those offices. Do not promise investors a month count.

USACE says processing time depends on permit type and project complexity. That is the honest federal line, and it is why I will not invent a Georgia average. [4] Nationwide or regional general permits can be shorter when you truly fit the terms. Individual permits are longer. Mitigation, endangered species, and historic resources add loops.

CMPA is calendar-driven. Miss a completeness item and you miss a meeting. Staff, not your lender's spreadsheet, decide when a file is complete. [2]

Local site plan and building review can run in parallel if you sequence it. It can also stall if zoning is wrong. Rezoning a waterfront parcel can take longer than the rack shop drawings. I'd pull the zoning letter before I paid a deposit on steel.

First steel on the ground is not opening day. Power, fire sign-off, stormwater as-builts, and the occupational tax certificate still sit in front of you. Build slack into the bank model. Anyone who guarantees a grand-opening date off a permit flowchart is not the person I'd hire.

What local paper do cities and counties still require?

Local paper is where a lot of dry stack plans die, and it has nothing to do with a mythical state marina board. Zoning has to allow outdoor storage, a warehouse-style rack building, forklift movement, and the traffic you will dump on a two-lane road Saturday morning.

Expect a site plan, a land-disturbance permit, building permits for the rack structure and any office, floodplain review if you are in a mapped flood zone, and fire review. Parking counts and stacking lanes get arguments. Neighbors care about noise and headlights at dawn.

The occupational tax certificate is the local "license." O.C.G.A. § 48-13-6 is the hook. [14] Bring your SOS documents and a lease or deed. Some cities want a state tax ID first. Confirm the order with that clerk so you do not bounce between windows.

If you disturb 1 acre or more, Georgia EPD construction stormwater coverage is on the table. That is a state filing that local land-disturbance staff will ask about. [9] Under an acre you may still owe a local erosion plan. Ask.

I'd rather redo a site plan than fight a use variance after I own the land. Option the dirt. Do not close until zoning is in writing.

What first-year operations paper do you keep on the wall?

Once you are stacking boats, the file shifts from permits to proof you can run the place without hurting people.

OSHA's powered industrial truck rule is 29 CFR 1910.178. Operators need training and evaluation before they run the forklift. Keep the records. A rack full of $80,000 hulls is not the spot to freelance. [10]

Fire inspections repeat. Sprinklers, hydrants, and aisle widths are not one-time drama. If you add fuel, you pick up a much uglier federal and state pile. I'd keep fuel off a first-year dry stack unless the site already has a compliant dock and you know the Coast Guard facility rules. New fuel is how small operators drown in paper.

Stormwater does not end at the notice of intent. If you are under a construction general permit, you close it out. If industrial stormwater applies to your SIC and activities, you keep the SWPPP alive. Confirm with EPD, not with a Facebook group. [9]

Secretary of State annual registration is $50 and it is easy to forget. [12] DOR returns follow whatever you actually charge. Corps leases and CMPA permits have conditions. Photograph the as-built and keep the special conditions in the break room, not in a box at the accountant.

Customer contracts, lien language, and hurricane haul plans are private paper, but lenders and insurers will ask. Write them before peak season.

How is inland Georgia different from the coast?

Inland is not a lighter version of CMPA. It is a different landlord.

On a Corps lake the United States often owns the shoreline. A commercial dry stack is a real estate deal with the district plus a regulatory permit if you touch the water. You cannot squat a rack barn on project land and "license" your way out. Read the shoreline management plan for that lake. Lanier is not Hartwell. Mobile District is not Savannah District.

Private inland ponds and quarries look easier until wetlands show up. Isolated-looking wet weather ditches still get argued. If you fill, you are back in 404 country. [3]

Georgia Power and other utility lakes have their own shoreline permits. Those are private or utility permissions, not a substitute for Corps or EPD paper when those statutes trigger.

CMPA does not follow you to Hall County. People still waste months asking CRD to bless a mountain lake barn. Call the right district. Then call the county.

If you are comparing other states' board language, the mismatch is normal. Florida's marina paper and Alabama's marina paper use different agency names for the same Corps-plus-state pattern.

What gets people stuck on Georgia marina applications?

Drawings that do not match the marsh line. That is the classic coastal stall. The committee cannot vote a fantasy bulkhead.

Treating a nationwide permit like a birthright is the classic Corps stall. If your fill, covered slips, or new launch well fall outside the general permit terms, you are in individual review. Pretending otherwise burns a season. [4] [6]

Zoning that allows "marina" in the code but bans the warehouse height you need is the classic local stall. Read the height limit and the outdoor storage line, not the use title.

Skipping 401 or stormwater because "it is only racks" is a frequent inland stall. Georgia EPD construction coverage is tied to disturbed acres, not to whether you feel like a marina. [8] [9]

Hiring the wrong professional is the expensive stall. A house architect who has never filed SAS or CMPA will learn on your nickel. I'd ask for file numbers from prior waterfront work before I signed an engagement letter.

Starting demolition on a rotting wet slip while "permits are in process" is how you get a stop-work and a restoration order. Don't.

What should you confirm with the board before you spend?

Confirm jurisdiction first. Is any part of the rack, launch well, or grading in marshlands, wetlands, or navigable water? Get that in writing from CRD, the Corps, or both. A phone vibe is not a permit. [2] [4]

Confirm the current CMPA application, fee, and next complete-file dates with Coastal Resources Division. Confirm the Corps permit type and fee with Savannah District or Mobile District. Confirm occupational tax, building, and land-disturbance fees with the city or county. Confirm EPD stormwater thresholds against your grading plan. [6] [9] [14]

Confirm zoning height, outdoor storage, and hours. Confirm whether the landlord is the Corps, a utility, or a private owner, because the lease may be harder than the permit.

I would not order rack steel, close on land, or print membership brochures until those emails are in the folder. DryStackPath is an independent publisher, not a law firm and not a service company, so treat this as a map, then verify every variable fact with the office that stamps it. The kit at /start does not replace that call.

How does Georgia compare with nearby state marina boards?

Georgia's coastal "board" is a marsh committee plus Corps and EPD. That is closer to other South Atlantic states than to a single marina license bureau. You still should not copy a Florida DEP file onto a Glynn County site and hope.

If you operate in more than one state, read each path as its own statute stack. Start with dry stack marina board in Florida and dry stack marina board in Alabama if those are your other docks. West and north, the names change again on the California, Delaware, Connecticut, and Illinois writeups.

The pattern repeats. Someone always claims there is one board. There is usually a water agency, a federal permit, and a city tax certificate. Georgia just happens to name its coastal voters the Coastal Marshlands Protection Committee.

Frequently asked questions

Do you need a license for dry stack marina in georgia?

No statewide dry stack marina license exists in Georgia. You still need an entity filing, a local occupational tax certificate, building permits, and, if you touch marsh, wetlands, or navigable water, a CMPA permit and a Corps authorization. Confirm the local certificate with the city or county. Confirm water permits with CRD and the Corps district.

How much does dry stack marina cost in georgia?

Official statewide filings are small. Georgia Secretary of State charges $100 for LLC articles and $50 for annual registration. A commercial Corps application fee is $100 under 33 CFR Part 325. Land, racks, pavement, stormwater, and the forklift are local construction bids. Confirm every current agency fee with the office that collects it.

How long does dry stack marina take in georgia?

There is no official statewide timeline. Upland building permits follow the county. CMPA follows completeness and the committee calendar. Corps individual permits follow public notice and review. USACE says timing depends on permit type and complexity. Confirm current queues. Do not publish an opening date until those offices have a complete file.

Is there a statewide marina operator license in Georgia?

No. Georgia does not issue a professional marina operator license for dry stack storage. Regulation is by project permit and local occupation tax, not by a statewide operator card. Anyone selling a generic "Georgia marina license" is not describing a real DNR or Secretary of State product.

Does a dry stack on Lake Lanier need a CMPA permit?

Usually no. CMPA applies to marshlands in the estuarine area, not to a north Georgia Corps lake. Lanier work runs through the Corps shoreline program and any Section 10 or 404 trigger, plus county paper. Confirm the shoreline management plan and the Mobile District process for that lake before you lease or build.

Do you need a 404 permit if the racks sit on upland?

Not for the racks themselves if they stay out of waters of the United States and you discharge no dredged or fill material. You can still trigger 404 with wetland fill, a launch well, or grading in a jurisdictional feature. Section 10 can still apply if a structure sits in navigable water. Get a delineation.

Who issues the Coastal Marshlands Protection permit?

The Coastal Marshlands Protection Committee issues the permit. Georgia DNR Coastal Resources Division staff the application and public process. O.C.G.A. § 12-5-286 is the statute that requires the permit before you alter marshlands or locate a structure on or over them in the estuarine area.

Do you need a forklift certification in Georgia?

Georgia does not hand out a special state forklift license for marinas. OSHA rule 29 CFR 1910.178 still requires employer training and evaluation before anyone operates a powered industrial truck. Keep those records on site. Insurers and OSHA both ask after an incident. Do not put an untrained operator in a mast-height marina forklift.

Is a Georgia occupational tax the same as a marina license?

No. An occupational tax certificate is a local revenue and registration document authorized under O.C.G.A. § 48-13-6. It is not a finding that your racks are legal in the marsh or the lake. You can hold the certificate and still be out of compliance on CMPA, Corps, or zoning paper.

Do you need stormwater coverage to build the racks?

If you disturb 1 acre or more, plan on a Georgia EPD NPDES construction stormwater filing unless staff tell you in writing that you do not. Local land-disturbance rules can apply under that acre. Industrial stormwater can apply later if your activities fit the permit. Confirm acreage and SIC treatment with EPD and the county.

Can you start construction while permits are pending?

Not in jurisdictional marsh, wetlands, or navigable water. Building without the required CMPA or Corps authorization is how you buy a restoration order. Limited upland work is a local call only if zoning and building staff allow it and you truly stay out of regulated areas. Get that in writing.

Does fuel change the permit stack?

Yes. A fuel dock adds fire code, spill planning, and often Coast Guard facility rules on top of marina storage paper. It is a different business. I'd open the dry stack first unless the site already has a compliant fuel system. Confirm fuel rules with the fire official and, if you transfer oil over water, the applicable Coast Guard parts.

What is federal consistency under Georgia's coastal program?

On the coast, some federal permits need a Coastal Zone Management consistency review so the project lines up with Georgia's approved coastal program. CRD runs that conversation. It is not a substitute for CMPA or for the Corps permit. Ask CRD whether your Department of the Army permit needs a consistency concurrence.

Where do you file if the site is on a Georgia Power lake?

Start with Georgia Power shoreline permission, then check Corps and EPD triggers if you touch water or wetlands, then file local zoning and building paper. Utility permission is not a state marina license and it is not a Section 10 permit. Confirm each office in that order before you pour foundations.

Sources

  1. U.S. EPA, Permit Program under CWA Section 404: Section 404 of the Clean Water Act regulates the discharge of dredged or fill material into waters of the United States, including wetlands.
  2. U.S. Army Corps of Engineers, Obtain a Permit: Corps permit processing time depends on the type of permit and the complexity of the project.
  3. 33 U.S.C. § 403, Rivers and Harbors Act Section 10: Creating an unauthorized obstruction to the navigable capacity of waters of the United States is prohibited.
  4. 33 CFR Part 325, Processing of Department of the Army Permits: Department of the Army permit processing rules include commercial application fees of $100 and noncommercial fees of $10.
  5. 33 CFR Part 322, Permits for Structures or Work in or Affecting Navigable Waters: Structures and work in or affecting navigable waters of the United States require Section 10 review.
  6. OSHA, 29 CFR 1910.178 Powered Industrial Trucks: Employers must train and evaluate powered industrial truck operators before they operate a forklift.
  7. Georgia Secretary of State, How to Form a Limited Liability Company: The fee to file Articles of Organization for a Georgia LLC is $100.
  8. Georgia Secretary of State, Annual Registration: Georgia entities file an annual registration, and the standard fee is $50.
  9. Georgia Department of Revenue, Sales and Use Tax: Businesses that make taxable sales in Georgia register for sales and use tax with the Department of Revenue.
  10. O.C.G.A. § 48-13-6, Local occupation tax: Georgia local governments are authorized to levy an occupation tax on businesses and practitioners.

Forklift + Insurance + Slip-Math Kit

Need the your state version of Forklift + Insurance + Slip-Math Kit?

Your dry stack marina folder: the path, the papers, and the first-year operating list. Personalized to your situation. $199 one-time.

Disclaimer: DryStackPath is an independent publisher. We are not a law firm, not a licensing board, and not a service company in this trade. This is not legal, medical, or professional advice. Rules, fees, and forms change and vary by state. Always confirm with the relevant authority. We do not file applications or perform the work for you, and we make no promises about approval or timing.